Sector – Civil Works and Construction
CIVIL - ROADS - AVIATION - RAIL - MINES - CONSTRUCTION
Australian Concrete Mats are used extensively in remediation, construction and maintenance works in various civil and infrastructure projects.
Concrete Mats offer long-term solutions that are also cost-effective, reliable and practical that deliver both construction savings and life-cycle optimisation.
Our solutions incorporate control of stabilisation, drainage and erosion. They also provide an environmentally sustainable solutions.
EXPLORE SOME CIVIL PROJECTS BELOW:
BRIDGES
ROADS
RAIL
MINING
AVIATION
PORTS
SHORELINES
DAMS AND LAKES
CAUSEWAYS


School Yard Slope Stabilisation – Bruce ACT – 1721
PROJECT: School grounds landscaping project and slope stabilisation LOCATION: Radford College Bruce ACT QLD PROJECT STATS: Mat: Firm Concrete...
Remote Steep Causeway Stabilisation – Moorang Q – 1142
PROJECT: Remote and steep bush track had steep sides. Concrete mats were used to protect slopes from erosion. LOCATION: Moorang QLD PROJECT STATS:...
Access Road for Mountain Trail – Finch Hatton Q – 1313
PROJECT: Bush road for access to mountain bike trail at Finch Hatton near Mackay. Road was gravel that kept washing out, they needed safe and hard...
Stormwater Drainage Residential Estate Dubbo NSW – 0319
PROJECT: Slope Stabilisation Stormwater Drains and Culvert Inlets and Outlets in new residential estate LOCATION: Keswick Estate DUBBO NSW PROJECT...
Waste Pond Rehabilitation – Goolgowi NSW – 1321
PROJECT: Waste and Sewer Ponds near Goolgowi rehabilitation project LOCATION: GOOLGOWI NSW 2652 PROJECT STATS: Mat: Flexible & Firm Concrete...
Highway Upgrade Swale Drains – Gympie QLD – 0786 & 043
PROJECT: New Gympie Bypass Highway Swale Drains LOCATION: Bruce Highway Upgrade - Cooroy to Curra Section D GYMPIE QLD 4570 PROJECT STATS: Mat:...
Levee Bank Stabilisation – Goolgowi NSW – 1201
PROJECT: Levee and Spillway Bank Stabilisation and scour Protection LOCATION: Goolgowi NSW 2652 PROJECT STATS: Mat: 6m rolls of Flexible Concrete...
Remote Steep Mountain Road – Lithgow NSW – 1246
PROJECT: Very steep and remote access road needed a permanent paving solution for access with trucks and heavy machinery for bush fire management as...
Industrial Development Drainage Channels – Bundamba Q – Stage 2 – 0721
PROJECT: Stage Two of Drainage Channels for new industrial construction development LOCATION: Citiswitch Industrial Complex Development, Bundamba Q...
Stormwater Culvert Drain at Knockrow NSW – 1186
PROJECT: Council Stormwater Culvert Drain in rural residential estate LOCATION: Cnr of Edwards and Martins Road at Knockrow NSW 2479 CONCRETE MAT...
Trapezoidal Drain at Inverell NSW – 0232
PROJECT: The concrete mats were used to minimise erosion and capture sediment in an open roadside trapezoidal drain. LOCATION: North from Taylor...
Solar Farm Drainage – Wagga Wagga NSW – 0299
PROJECT: The concrete mats were used to minimise erosion in a swale drain that was put in place to protect the substation from flooding, there is...
Roadside Swale Drains on 3way junction at Myocum NSW – 0289
PROJECT: Roadside runoff swale drains and slope stabilisation for Byron Shire Council. LOCATION: At the 3 way junction of Myocum Road, Kennedys Lane...
Stormwater Drain – Cararra Q 0208
PROJECT: Stormwater Drain and Embankment Stabilisation for Gold Coast City Council LOCATION: Hickey Way Cararra Q 4211 PROJECT STATS: Mat: Flexible...
Stormwater Drainage Channel Burpengary Q – 0291
PROJECT: Stormwater Drainage Channel LOCATION: 186 Bruce Highway Eastern Service Road, East Burpengary QLD 4505. PROJECT STATS: Mat: FIRM Concrete...
River Embankment Access for Dog Park – Townsville Q – 0211
PROJECT: Dog Park river bank access LOCATION: Apex Dog Park, Townsville City Council Q 4815 PROJECT STATS: Mat: Flexible Concrete Erosion...
Industrial Development Drainage Channels – Bundamba Q – Stage 1 – 0214
PROJECT: Drainage Channels for new industrial construction development LOCATION: Citiswitch Industrial Complex Development, Bundamba Q PROJECT...
Village Stormwater Drain – Legume NSW – 0244
PROJECT: Village Stormwater Drain LOCATION: Legume NSW PROJECT STATS: Mat: Flexible Concrete Erosion MatUnderlay: Biodegradable Nutrition Geotextile...
Harbour Shoreline Stabilisation at Fish Market Redevelopment Site at Glebe NSW – 0281
PROJECT: Temporary Shoreline Stabilisation and Scour protection during construction works at Sydney Fish Market Redevelopment Site LOCATION: The...
Stormwater Drain Edging Lismore NSW – 0271
PROJECT: Suburban Stormwater Drain Edging LOCATION: Wyrallah Road Lismore NSW 2480 PROJECT STATS: Mat: Flexible Concrete Erosion MatUnderlay:...
Roadside Culvert and Embankment Stabilisation – Pilton QLD – 0179
PROJECT: Culvert and Embankment Stabilisation for Pilton Ag Trust Regional Q LOCATION: Manapouri Road in rural district of Pilton in South East QLD...
Highway Embankment Stabilisation – Calliope Q 0171
PROJECT: Culvert and Slope Stabilisation and protection LOCATION: Calliope Q PROJECT STATS: Mat: Flexible Concrete Erosion MatUnderlay:...
Pathway and Slope Stabilisation Airlie Beach Q – 0212
PROJECT: Pathway and Slope Stabilisation and scour protection LOCATION: Airlie Beach Q PROJECT STATS: Mat: Flexible Concrete Erosion Mat Underlay:...
Wide Roadside Drainage Channel in Thargomindah Q – 0147
PROJECT: Repair and line wide drainage channels with concrete mats for roadside drains. LOCATION: Bulloo Shire Council at Thargomindah Q PROJECT...
Rail Drainage Culverts and Slope Stabilisation at Chinchilla Q – 0120
PROJECT: Upgrade slope stabilisation, erosion control and drainage and culvert lining LOCATION: Western Downs Regional Council, Chinchilla QLD...
Replace Rip Rap on Roadside Drain at Beechmont Q – 0116
PROJECT: Replace eroded and failing Rip Rap drain with Flexible Concrete Erosion Mats LOCATION: Beechmont QLD 4211 PROJECT STATS: 180 square metres....
Upgrade Stormwater Drains at Lismore – 0111
PROJECT: Lismore City COuncil Upgrade eroded stormwater drains by lining with flexible concrete mats LOCATION: Keen Street Gundarimba Lismore NSW...
Sea Wall Scour Protection at Shute Harbour QLD – 0106
PROJECT: Shute Harbour and Seawall LOCATION: Shute Harbour QLD 4802 PROJECT STATS: 156 square metres 54 Cable Block Mats 8 tonne excavator 1...
Wide Drainage Channel at Moss Vale NSW – 0117
PROJECT: To upgrade and construct a drainage channel alongside sports fields and railway track LOCATION: Church Street, MOSS VALE NSW 2577 PROJECT...
Bridge Abutment at Ipswich QLD – 0122
PROJECT: Bridge abutment stabilisation at Deebing Creek Bridge Works LOCATION: RIPLEY QLD 4306, for Ipswich Shire Council PROJECT STATS: 1656...
Temporary Boat Ramp at Dingo Beach QLD – 0103
PROJECT: Build Temporary Boat Ramp for access alongside the construction of permanent ramp LOCATION: DINGO BEACH near PROSERPINE QLD 4800 PROJECT...
Driveway Swale Drain at Alstonvale NSW – 0100.A
PROJECT: Farm access road required roadside drains to be cleaned up and protected from further erosion. Concrete Erosion Mats were applied to swale...
Roadside Swale Drain at Beaudesert QLD – 0104
PROJECT: Concrete Erosion Mats were applied to swale drains along the edges of a newly constructed road and bridge. LOCATION: Brookland Bridge...
INDUSTRY SECTORS
