PROJECT:

This project was completed in 2 sections and time frames, the first section was constructed in early 2024, the second part was in July 2025.

A new driveway on the farm needed a firm surface to drive on and stop the washout of gravel. New sheds are being constructed, and this road would need to be able to cope with semi trucks and traffic from construction across it. Run off from slopes above, and also the slippery clay red soils, and a sloped and curved track would potentially make it a challenging road if not treated with concrete mats to enable all-weather access..

LOCATION:

TUCKOMBIL NSW 2477

PROJECT STATS:

Mat: Firm & Flexible Concrete Erosion Mats
Underlay: Non-Woven Geotextile Underlay 
Anchoring: Steel UBar Anchors

PART ONE: Early 2024 – Flexible Concrete Erosion Mats
PART TWO: July 2025 – Firm Concrete Erosion Mats

OUR REF: ACM 0100.S

INSTALLED BY CONTRACTOR: LILL PLANT HIRE (Rod Lill)

INDUSTRY SECTORS

RURAL

Rural, Agricultural & Private Projects

RURAL – AGRICULTURAL – GRAZIERS – PASTORAL – ORCHARDS – IRRIGATION

PUBLIC WORKS

Local Councils, Municipal & Public Works

PUBLIC WORKS – REGIONAL GOVERNMENT – LOCAL COUNCILS – CIVIC – MUNICIPAL

CIVIL

Construction, Roads, Bridges, Mining & Energy

CIVIL – ROADS – AVIATION – RAIL – MINES – CONSTRUCTION

ENVIRONMENTAL

Environmental and Rehabilitation Projects

ENVIRONMENTAL – REGENERATION – REHABILITATION – SUSTAINABLE

COASTAL & MARINE

Coastal, Maritime and Beach Projects

MARINE – COASTAL – BEACHES – PORTS – SHORELINES