Causeway Spillway and Culvert Repairs – Merrigal NSW – 2880

Causeway Spillway and Culvert Repairs – Merrigal NSW – 2880

PROJECT: Reconstruction of the Dragon Cowal causeway on Merrigal Road as part of Warren Shire’s flood damage works. Firm Concrete Mats were used as stabilisation and erosion control on this project.  LOCATION: Dragon Cowal Merrigal Road Merrigal NSW CLIENT:...
Spillway at Camp Creek QLD – 1188 & 1787

Spillway at Camp Creek QLD – 1188 & 1787

PROJECT: Erosion Repair and Stabilisation on Spillways LOCATION: Camp Creek NSW/QLD Border 4385 LOCATION: MATS: Firm Concrete Mats in Custom 20m Lengths and Rolled onto Pipes OUR REF: ACM 1188 & 1787 GALLERY OF WORKS INDUSTRY SECTORS RURAL Rural, Agricultural...
Dam Wall Access Track Stabilisation Preston Q – 2183

Dam Wall Access Track Stabilisation Preston Q – 2183

PROJECT: Farmer needed safe and stable access across his dam wall and overflow. Concrete erosion mats were a sound solution. They are now being vegetated and the access to both sides of the dam are easily accessible during the muddy wet season. LOCATION: Preston QLD...
Dam Spillway Erosion Repair using Flexible Concrete Mats

Dam Spillway Erosion Repair using Flexible Concrete Mats

Innovative Concrete Mats Safeguard Dam Infrastructure: A SEQ Success Story In the picturesque region of South East Queensland (SEQ), dam overflow has long posed risks due to historically poor spillway designs. Such designs allow water to rush too quickly, eroding...