Farm Spoon Drain Repair at Dixons Creek VIC – 0182

Farm Spoon Drain Repair at Dixons Creek VIC – 0182

PROJECT: Repair collapsed farm drain and spillway to restore stability to eroded banks and reduce sediment runoff from entering creek below. LOCATION: Dixons Creek in Yarra Valley Victoria PROJECT STATS: 36 square metres 1 x 15m roll 2.4m wide Underlay geotextile was...
Boat Ramp into river at Lower Portland NSW – 0140

Boat Ramp into river at Lower Portland NSW – 0140

PROJECT: Build Boat Ramp for river bank LOCATION: Wheelbarrow Ridge Road LOWER PORTLAND NSW 2756 PROJECT STATS: 72 square metres 2 Rolls – 2.4m wide x 15m Non-Woven Geotextile Underlay Excavator to install 1 operator and 1 labourer  OUR REF: ACM 0140 Download...
Trail Bike Track Repair at Alstonville NSW – 0100.F

Trail Bike Track Repair at Alstonville NSW – 0100.F

PROJECT: Repair Mountain Bike Trail that had become unsafe due to erosion. LOCATION: Duck Creek Mountain Trail Bike Park. Alstonville NSW 2477 PROJECT STATS: 16 square metres (1200mm strips} 3 hours start to finish Hand placed 3 labourers OUR REF: ACM 0100.F PROJECT...
Residential Landscaping at Ballina NSW – 0100.G

Residential Landscaping at Ballina NSW – 0100.G

PROJECT: Repair drainage slope and eroded area between adjoining buildings. LOCATION: Residential property, Ballina NSW 2478 PROJECT STATS: 8 square metres 4 hours start to finish Manual Labour Husband and Wife OUR REF: ACM 0100.G PROJECT OVERVIEW The shaded area...
Run Off Drain at Pine Mountain QLD – 0135

Run Off Drain at Pine Mountain QLD – 0135

PROJECT: Build replacement stormwater drain for Queensland Healthy Land & Water LOCATION: Pine Mountain Queensland PROJECT STATS: 72 square metres 4 hours start to finish 8 tonne excavator 1 operator and 2 labourer OUR REF: ACM 0135 Download Technical Drawing...
Irrigation Pond Embankment at Nanango QLD – 0129

Irrigation Pond Embankment at Nanango QLD – 0129

PROJECT: Stabilise slope of new irrigation pond embankment being built for new pump heads LOCATION: Nanango QLD 4615 PROJECT STATS: 108 square metres 3 hours start to finish 20 tonne excavator 1 operator and 2 labourers OUR REF: ACM 0129 Download Project Study pdf...