Feed Water Trough Hard Stand at Yelarbon Q – 1626

Feed Water Trough Hard Stand at Yelarbon Q – 1626

PROJECT: To create hard stand stable surface around troughs for livestock. LOCATION: Rissmerino & Rosedale Pastoral at Yelarbon Q 4388 PROJECT STATS: 9 x Firm Rolls 8m long each with Non-Woven Geotextile Underlay. Anchored using steel ubar anchors and top filled....
Dam Overflow Spillway – Menindee NSW – 2192

Dam Overflow Spillway – Menindee NSW – 2192

PROJECT: Dam Overflow and Spillway Erosion Control LOCATION: MENINDEE NSW 2878 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 2192 RESELLER:FAR WEST RURAL SUPPLIES – BROKEN HILL...
Blueberry Farm Tunnel Drainage – Wamuran QLD – 2382

Blueberry Farm Tunnel Drainage – Wamuran QLD – 2382

PROJECT: Blueberry Farm Tunnel Drainage and Erosion Control in high rainfall area. LOCATION: WAMURAN QLD 4512 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay (200gsm)Joining Strips: Two Layered Joining Strips used under...
Dam Spillway – Gayndah Q- 0880

Dam Spillway – Gayndah Q- 0880

PROJECT: Dam Overflow and Spillway Stabilisation LOCATION: GAYNDAH QLD 4625 PROJECT STATS: Mat: Flexible Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 0880 GALLERY OF WORKS INDUSTRY SECTORS RURAL Rural,...
Dam Spillway – Bora Ridge NSW – 1857

Dam Spillway – Bora Ridge NSW – 1857

PROJECT: Dam Overflow and Spillway Stabilisation LOCATION: BORA RIDGE NSW 2471 PROJECT STATS: Mat: Flexible Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 1857 GALLERY OF WORKS INDUSTRY SECTORS RURAL Rural,...
Car Park Hard Stand Area at Yandina Q – 2170

Car Park Hard Stand Area at Yandina Q – 2170

PROJECT: Slippery and boggy driveway and carport replaced by Concrete Mats LOCATION: Yandina QLD 4561 PROJECT STATS: Firm concrete mats 2.4m wide and 6m lengths where chosen for the driveway and carport. Installed with a 5 ton excavator. Concrete Mats were an...