Mangrove Shoreline Access Ramp – Oyster Point QLD – 4166

Mangrove Shoreline Access Ramp – Oyster Point QLD – 4166

PROJECT: Stable shoreline access ramp using Articulated Concrete Block Mats for sensative mangrove habitat LOCATION: Oyster Point Redland City QLD Kybeyan West Fire Trail, Numeralla Nature Reserve, Snowy Monara Region NSW 2630 CONCRETE MAT SPECS: Mat: Articulated...
Causeway Spillway and Culvert Repairs – Merrigal NSW – 2880

Causeway Spillway and Culvert Repairs – Merrigal NSW – 2880

PROJECT: Reconstruction of the Dragon Cowal causeway on Merrigal Road as part of Warren Shire’s flood damage works. Firm Concrete Mats were used as stabilisation and erosion control on this project.  LOCATION: Dragon Cowal Merrigal Road Merrigal NSW CLIENT:...
Batter Stabilisation Snowy Hydro – Cabramurra NSW – 1411

Batter Stabilisation Snowy Hydro – Cabramurra NSW – 1411

PROJECT: Batter Stabilisation for Operations Infrastructure Buildings  LOCATION: Cabramurra NSW 2629 – near Snowy Hydro Upper Tumut Works Depot(highest township in Australia) PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile...