ACM Project – Irrigation Pond Embankment – Nanango QLD

ACM Project – Irrigation Pond Embankment – Nanango QLD

PROJECT: Stabilise slope of new irrigation pond embankment being built for new pump heads LOCATION: Darley’s Crossing Nanango QLD 4615 PROJECT STATS: 108 square metres 3 hours start to finish 20 tonne excavator 1 operator and 2 labourers OUR REF: ACM 0129 Click...
ACM Project – Deebing Creek Bridge Abutment – Ipswich QLD

ACM Project – Deebing Creek Bridge Abutment – Ipswich QLD

PROJECT: Bridge abutment stabilisation at Deebing Creek Bridge Works LOCATION:  RIPLEY QLD 4306, for Ipswich Shire Council PROJECT STATS: 1656 square metres 46 x 15m rolls of Concrete Erosion Mat (uncracked) 20 tonne excavator 1 operator and 2 labourers Client request...
ACM Project – Temporary Boat Ramp – Dingo Beach QLD

ACM Project – Temporary Boat Ramp – Dingo Beach QLD

PROJECT: Build Temporary Boat Ramp for access alongside the construction of permanent ramp LOCATION:  DINGO BEACH near PROSERPINE QLD 4800 PROJECT STATS: 168 square metres 5 hours start to finish 8 tonne excavator 1 operator and 2 labourer Click to download Technical...
ACM Project – Orchard Water Channel – Alstonvale NSW

ACM Project – Orchard Water Channel – Alstonvale NSW

PROJECT: Cleanup and protection of Macadamia orchard water channel and drain LOCATION: Sneaths Lane, ALSTONVALE NSW 2477   PROJECT STATS: 150 linear metres 10 rolls – 2.4 wide x 15m long 4 hours start to finish 1 x 5 tonne excavator 1 operator and 1 labourer...
ACM Project – Roadside Swale Drain – Alstonvale NSW

ACM Project – Roadside Swale Drain – Alstonvale NSW

PROJECT: Farm access road required roadside drains to be cleaned up and protected from further erosion. Concrete Erosion Mats were applied to swale drains along road edges and to entrance of culverts. LOCATION: Sneath’s Road ALSTONVALE NSW 2477    ...