Canal Scour Protection and Access Ramp – Ballina NSW

Canal Scour Protection and Access Ramp – Ballina NSW

PROJECT: under DRAFT ** Scour protection for residents of the canal that was eroding. Residents’ waterway access and embankment erosion protection at the tidal zone.  LOCATION: BALLINA NSW 2477 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven...
Dam Spillway & Overflow – Alstonville NSW – 0100.O

Dam Spillway & Overflow – Alstonville NSW – 0100.O

PROJECT: Dam overflow repair after floods and stabilisation and erosion control for spillway LOCATION: ALSTONVILLE NSW 2477 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile UnderlayJoining Strip: 800mm wide Geotextile underlay and Geogrid...
Waste Pond Rehabilitation – Goolgowi NSW – 1321

Waste Pond Rehabilitation – Goolgowi NSW – 1321

PROJECT: Waste and Sewer Ponds near Goolgowi rehabilitation project LOCATION: GOOLGOWI NSW 2652 CLIENT: CARRATHOOL SHIRE COUNCIL PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: 400gsm Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM...
Flood Levee Bank Stabilisation – Goolgowi NSW – 1201

Flood Levee Bank Stabilisation – Goolgowi NSW – 1201

PROJECT: Flood Levee and Spillway Stabilisation and Drainage LOCATION: GOOLGOWI NSW 2652 PROJECT STATS: Mat: 6m rolls of Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Joining Strip with Steel UBar Anchors OUR REF: ACM 1201 The matts were...