Trail Bike Track Drains at Jindabyne NSW – 0814

Trail Bike Track Drains at Jindabyne NSW – 0814

PROJECT: Repair eroded drains on Trail Bike Track LOCATION: Jindabyne NSW 2627 OUR REF: ACM 0814 BEFORE AFTER GALLERY OF WORKS ACM-0814-Bike-Track-Drains-Cooma-NSW-01 ACM-0814-Bike-Track-Drains-Cooma-NSW-07 ACM-0814-Bike-Track-Drains-Cooma-NSW-04...
Dam Spillway & Overflow – Alstonville NSW – 0100.O

Dam Spillway & Overflow – Alstonville NSW – 0100.O

PROJECT: Dam overflow repair after floods and stabilisation and erosion control for spillway LOCATION: ALSTONVILLE NSW 2477 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile UnderlayJoining Strip: 800mm wide Geotextile underlay and Geogrid...
Waste Pond Rehabilitation – Goolgowi NSW – 1321

Waste Pond Rehabilitation – Goolgowi NSW – 1321

PROJECT: Waste and Sewer Ponds near Goolgowi rehabilitation project LOCATION: GOOLGOWI NSW 2652 PROJECT STATS: Mat: Flexible & Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay¬†Anchoring: Steel UBar Anchors OUR REF: ACM 1321   UPDATED PICS...
Levee Bank Stabilisation – Goolgowi NSW – 1201

Levee Bank Stabilisation – Goolgowi NSW – 1201

PROJECT: Levee and Spillway Bank Stabilisation and scour Protection LOCATION: Goolgowi NSW 2652 PROJECT STATS: Mat: 6m rolls of Flexible Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Joining Strip with Steel UBar Anchors OUR REF: ACM 1201...