Dam Spillway & Overflow – Alstonville NSW – 0100.O

Dam Spillway & Overflow – Alstonville NSW – 0100.O

PROJECT: Dam overflow repair after floods and stabilisation and erosion control for spillway LOCATION: ALSTONVILLE NSW 2477 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile UnderlayJoining Strip: 800mm wide Geotextile underlay and Geogrid...
Waste Pond Rehabilitation – Goolgowi NSW – 1321

Waste Pond Rehabilitation – Goolgowi NSW – 1321

PROJECT: Waste and Sewer Ponds near Goolgowi rehabilitation project LOCATION: GOOLGOWI NSW 2652 PROJECT STATS: Mat: Flexible & Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 1321   UPDATED PICS...
Levee Bank Stabilisation – Goolgowi NSW – 1201

Levee Bank Stabilisation – Goolgowi NSW – 1201

PROJECT: Levee and Spillway Bank Stabilisation and scour Protection LOCATION: Goolgowi NSW 2652 PROJECT STATS: Mat: 6m rolls of Flexible Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Joining Strip with Steel UBar Anchors OUR REF: ACM 1201...
River Embankment Access for Dog Park – Townsville Q – 0211

River Embankment Access for Dog Park – Townsville Q – 0211

PROJECT: Dog Park river bank access LOCATION: Apex Dog Park, Townsville City Council Q 4815 PROJECT STATS: Mat: Flexible Concrete Erosion MatUnderlay: Biodegradable Nutrition Geotextile Underlay Anchoring: Trenched at top and U Bar Anchors OUR REF: ACM 0211 Download...