Farm Spoon Drain Repair at Dixons Creek VIC – 0182

Farm Spoon Drain Repair at Dixons Creek VIC – 0182

PROJECT: Repair collapsed farm drain and spillway to restore stability to eroded banks and reduce sediment runoff from entering creek below. LOCATION: Dixons Creek in Yarra Valley Victoria PROJECT STATS: 36 square metres 1 x 15m roll 2.4m wide Underlay geotextile was...
Upgrade Stormwater Drains at Lismore – 0111

Upgrade Stormwater Drains at Lismore – 0111

PROJECT: Lismore City COuncil Upgrade eroded stormwater drains by lining with flexible concrete mats LOCATION: Keen Street Gundarimba Lismore NSW 2480 PROJECT STATS: 240 square metres 5 hours start to finish 8 tonne excavator 1 operator and 2 labourers OUR REF: ACM...
Orchard Drain – Rous Mill NSW – 0137

Orchard Drain – Rous Mill NSW – 0137

PROJECT: Cleanup and protection of Macadamia orchard water channel and drain LOCATION: Rous Mill NSW 2477 PROJECT STATS: 180 linear metres 18 rolls – 2.4 wide x 10m long 8 hours start to finish 1 x 8 tonne excavator 1 operator and 2 labourer OUR REF: ACM 0137 The...
Run Off Drain at Pine Mountain QLD – 0135

Run Off Drain at Pine Mountain QLD – 0135

PROJECT: Build replacement stormwater drain for Queensland Healthy Land & Water LOCATION: Pine Mountain Queensland PROJECT STATS: 72 square metres 4 hours start to finish 8 tonne excavator 1 operator and 2 labourer OUR REF: ACM 0135 Download Technical Drawing...
Wide Drainage Channel at Moss Vale NSW – 0117

Wide Drainage Channel at Moss Vale NSW – 0117

PROJECT: To upgrade and construct a drainage channel alongside sports fields​ and railway track LOCATION: Church Street, MOSS VALE NSW 2577 PROJECT STATS: 2350 square metres 4 weeks  start to finish 8 tonne excavator 4 tonne excavator skid steer grader dump truck 1...
Orchard Drain at Alstonvale NSW – 0100.B

Orchard Drain at Alstonvale NSW – 0100.B

PROJECT: Cleanup and protection of Macadamia orchard water channel and drain LOCATION: Sneaths Lane, ALSTONVALE NSW 2477   PROJECT STATS: 150 linear metres 10 rolls – 2.4 wide x 15m long 4 hours start to finish 1 x 5 tonne excavator 1 operator and 1 labourer...