Causeway Spillway and Culvert Repairs – Merrigal NSW – 2880

Causeway Spillway and Culvert Repairs – Merrigal NSW – 2880

PROJECT: Reconstruction of the Dragon Cowal causeway on Merrigal Road as part of Warren Shire’s flood damage works. Firm Concrete Mats were used as stabilisation and erosion control on this project.  LOCATION: Dragon Cowal Merrigal Road Merrigal NSW CLIENT:...
Detention Basin Upgrade Works Suffolk Park NSW – 3247

Detention Basin Upgrade Works Suffolk Park NSW – 3247

PROJECT: Upgrade works on the Open Detention Basin, Spillway and Culverts LOCATION: Coogera Circuit Suffolk Park NSW 2481 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar AnchorsJoining Strips: Under...
Roadside Trapezoidal Drain – Myocum NSW – 2959

Roadside Trapezoidal Drain – Myocum NSW – 2959

PROJECT: Roadside Trapezoidal Drains at Council Wastewater Facilities LOCATION: MYOCUM 2481 NSW PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 2959 CONTRACTOR: RCC Civil  GALLERY OF...
Overflow Chute – Myocum NSW – 3140

Overflow Chute – Myocum NSW – 3140

PROJECT: Stormwater Overflow Chute at Council Wastewater Depot LOCATION: MYOCUM NSW 2481 CONCRETE MAT SPECS: Mat: Flexible Concrete Mats Erosion MatsUnderlay: 200gsm Non-Woven Geotextile UnderlayAnchoring: Steel UBar AnchorsJoining Strips: Two Layered Joining Strips...