Remote Steep Causeway Stabilisation – Moorang Q – 1142

Remote Steep Causeway Stabilisation – Moorang Q – 1142

PROJECT: Remote and steep bush track had steep sides. Concrete mats were used to protect slopes from erosion.  LOCATION: Moorang QLD PROJECT STATS: Mat: Flexible Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM...
Creek Crossing and Causeway at Byabarra NSW – 0345

Creek Crossing and Causeway at Byabarra NSW – 0345

PROJECT: Creek crossing and causeway track stabilisation and erosion control for access and safe crossing in and out of the causeway on low creek crossing. LOCATION: Byabarra NSW 2446 CONCRETE MAT SPECS: Mat: Flexible Concrete Erosion MatsUnderlay: 200gsm Non-Woven...
Access Track across Causeway Cleveland QLD – 0260

Access Track across Causeway Cleveland QLD – 0260

PROJECT: Access tracks for in and out of the concrete causeway on low creek crossing. LOCATION: Dept. of Agriculture and Fisheries Redland Research Facility, Cleveland QLD 4163 CONCRETE MAT SPECS: Mat: Flexible Concrete Erosion MatsUnderlay: 200gsm Non-Woven...
Low Level Creek Crossing at Meerschaum Vale NSW – 0100.E

Low Level Creek Crossing at Meerschaum Vale NSW – 0100.E

PROJECT: To construct a services access road through a swampy area for Country Energy Contractor vehicles. LOCATION: Marom Creek Road, MEERSCHAUM VALE NSW PROJECT STATS: 36 square metres – 1 roll – 2.4m wide x 15m mat 1.5 hour start to finish 1 5 ton...