Dam Overflow Spillway Drain – Molesworth VIC – 2157

Dam Overflow Spillway Drain – Molesworth VIC – 2157

PROJECT: Dam Overflow and Spillway Stabilisation on a long steep overflow drain.  LOCATION: MOLESWORTH VIC 3719 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 2157 GALLERY OF WORKS...
School Yard Slope Stabilisation – Bruce ACT – 1721

School Yard Slope Stabilisation – Bruce ACT – 1721

PROJECT: School grounds landscaping project and slope stabilisation LOCATION: Radford College Bruce ACT QLD PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM 1721 CONTRACTOR: Ranger...
Remote Steep Causeway Stabilisation – Moorang Q – 1142

Remote Steep Causeway Stabilisation – Moorang Q – 1142

PROJECT: Remote and steep bush track had steep sides. Concrete mats were used to protect slopes from erosion.  LOCATION: Moorang QLD PROJECT STATS: Mat: Flexible Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar Anchors OUR REF: ACM...
Access Road for Mountain Trail – Finch Hatton Q – 1313

Access Road for Mountain Trail – Finch Hatton Q – 1313

PROJECT: Bush road for access to mountain bike trail at Finch Hatton near Mackay. Road was gravel that kept washing out, they needed safe and hard surface for 2wheel drive vehicles to access, even in rainy conditions. LOCATION: Finch Hatton near Mackay QLD PROJECT...
Stormwater Drainage Residential Estate Dubbo NSW – 0319

Stormwater Drainage Residential Estate Dubbo NSW – 0319

PROJECT: Slope Stabilisation Stormwater Drains and Culvert Inlets and Outlets in new residential estate LOCATION: Keswick Estate DUBBO NSW  PROJECT STATS: Mat: Flexible & Firm Concrete Erosion MatsUnderlay: Non-Woven Geotextile Underlay Anchoring: Steel UBar...