ACM Project – Deebing Creek Bridge Abutment – Ipswich QLD

ACM Project – Deebing Creek Bridge Abutment – Ipswich QLD

PROJECT: Bridge abutment stabilisation at Deebing Creek Bridge Works LOCATION:  RIPLEY QLD 4306, for Ipswich Shire Council PROJECT STATS: 1656 square metres 46 x 15m rolls of Concrete Erosion Mat (uncracked) 20 tonne excavator 1 operator and 2 labourers Client request...
ACM Project – Temporary Boat Ramp – Dingo Beach QLD

ACM Project – Temporary Boat Ramp – Dingo Beach QLD

PROJECT: Build Temporary Boat Ramp for access alongside the construction of permanent ramp LOCATION:  DINGO BEACH near PROSERPINE QLD 4800 PROJECT STATS: 168 square metres 5 hours start to finish 8 tonne excavator 1 operator and 2 labourer Click to download Technical...
ACM Project – Roadside Swale Drain – Alstonvale NSW

ACM Project – Roadside Swale Drain – Alstonvale NSW

PROJECT: Farm access road required roadside drains to be cleaned up and protected from further erosion. Concrete Erosion Mats were applied to swale drains along road edges and to entrance of culverts. LOCATION: Sneath’s Road ALSTONVALE NSW 2477    ...
ACM Project – Roadside Swale Drain – Beaudesert QLD

ACM Project – Roadside Swale Drain – Beaudesert QLD

PROJECT: Concrete Erosion Mats were applied to swale drains along the edges of a newly constructed road and bridge. LOCATION: Brookland Bridge Kagaru Project, Scenic Rim Regional Council, BEAUDESERT QLD 4285 PROJECT STATS: 1050 square metres Laid over 2 days 1 TD...