Remote Access for Tanker and Fish Pathway Restoration on Fire Trail NSW – 4533
PROJECT: Fire Trail Causeway for Heavy Tanker Access plus Fish Pathway Restoration built with Articulated Concrete Block Mats for stable all-weather...
A Road in a Roll (Innovative installation) – Magnetic Island QLD – 4859
PROJECT: A ROAD IN A ROLL - Limited equipment, remote location and high flow wet season culvert crossing. Innovative solution for installation....
Suburban Slippery Driveway Repair – Alstonville NSW – 4397
PROJECT: Concrete strips driveway in red soil became slippery for residents' access. Concrete mats replaced the driveway surface. Now they have...
Rural Gravel Driveway Repair – Chilcotts Grass NSW – 3845
PROJECT: Resurface rural gravel driveway to make an accessible surface for the residence and sheds. LOCATION: Taylors Road Chilcotts Grass NSW 2480 ...
Steep Slippery Driveway Repair – Maleny QLD – 3623
PROJECT: Make accessible the steep slippery driveway to the residence for safe all-weather vehicle access. LOCATION: Eco Village, Maleny QLD 4552...
Steep Bush Driveway – Withcott QLD – 2541
PROJECT: Upgrade the 750m Steep Bush Driveway to the hilltop residence and sheds for safe all-weather 2WD and heavy vehicle access. Client made road...
Beach Access Track with Articulated Concrete Block Mats – Manning Point NSW – 5108
PROJECT: Safe dune and beach access track using Articulated Concrete Loop Block Mats for municipal 4WD track LOCATION: Farquhar Inlet and beach,...
Causeway on Fire Trail – Numeralla Nature Reserve NSW – 3299
PROJECT: Fire Trail Causeway Crossing built with Articulated Concrete Block Mats for stable all-weather access LOCATION: Kybeyan West Fire Trail,...
Causeway Crossing – Timmallallie National Park NSW – 2608
PROJECT: Remote Crossing Causeway using Articulated Concrete Cable Block Mats for all-weather access LOCATION: No 1 Break Road Timmallallie National...
Control erosion and build better whoa-boys on gravel roads and driveways with Concrete Mats.
Control erosion and build better whoa-boys on gravel roads and driveways with Concrete Mats. What is a Whoa-Boy? Ever wondered about those subtle...
Camp Grounds Access Road Repairs – Nowendoc NSW – 0554
PROJECT: Camping Ground Access Road Repairs to replace slippery paving stones. LOCATION: Knorritt Flat River Camp, Caffery Flats, Nowendoc NSW 2424...
Driveway Runoff Drain – Kyogle NSW – 2262
PROJECT: Rural Driveway Runoff Drains LOCATION: KYOGLE NSW 2474 PROJECT STATS: Mat: 1.2m wide Concrete Erosion MatsUnderlay: Non-Woven Geotextile...
Remote Bush Driveway Upgrade – Mooloolah Valley QLD – 3108
PROJECT: Property Owner Access Driveway Upgrade LOCATION: Mooloolah Valley QLD 4553 PROJECT STATS: Mat: Firm Concrete Erosion MatsUnderlay:...
Nursery Swale Drains & Tracks – Teven NSW – 1756
PROJECT: Nursery located on sloped site with boggy tracks, erosion and washouts of gravel and drainage issues. LOCATION: TEVEN NSW 2478 PROJECT...
Causeway Splash Crossing – Currawan NSW – 2236
PROJECT: Splash Crossing Causeway Repair - Removed wooden structure and replaced with Concrete Blocks for residents access. LOCATION: ...
Access Road for Mountain Trail – Finch Hatton Q – 1313
PROJECT: Bush track for access to mountain bike trail at Finch Hatton near Mackay. Road was gravel that kept washing out, they needed safe and hard...
Parks Access Track Upgrade – Mt Kosciuszko Perisher Valley NSW – 2318
PROJECT: Ranger Access Track Upgrade at Snowy Mountains National Park LOCATION: Piper Creek Track Perisher Valley NSW 2624 PROJECT STATS: Mat: Firm...
Farm Drainage and Crossings for Vehicles and Livestock – Tucki Tucki Swamp – 1512
PROJECT: Extensive Drainage Channels and Crossings of water channels for livestock and vehicles on swampy farm. Mats were used on several places on...
All-Weather Steep Bush Track at Elaman Creek QLD – 2203
PROJECT: Make safe a boggy slippery steep farm track LOCATION: Elaman Creek QLD 4552 OUR REF: ACM 2203CLICK TO WATCH THE OWNERS VIDEO OF...
Trail Bike Track Drains at Jindabyne NSW – 0814
PROJECT: Repair eroded drains on Trail Bike Track LOCATION: Jindabyne NSW 2627 OUR REF: ACM 0814BEFOREAFTERGALLERY OF WORKS INDUSTRY SECTORSRURAL...
Rainforest Creek Crossing – Goonengary NSW – 1981
PROJECT: Property with Rainforest needed all weather access for creek crossing. LOCATION: Mafeking Road Goonengery NSW 2480 CONCRETE MAT SPECS:...
Creek Crossing Rectification Mount Mort QLD – 0619
PROJECT: Recitification works on Creek Crossing to allow safe truck crossing and also to rehabilitate so that fish could travel upstream again....
Rural Driveway and Car Park Hard Stand – Mcleans Ridges NSW – 0100.i
PROJECT: A previously boggy driveway on rural property needed firm surface to drive on also a car park hard stand for residents vehicle. LOCATION:...
Rural Driveway – Tuckombil NSW – 0100.S
PROJECT: This project was completed in 2 sections and time frames, the first section was constructed in early 2024, the second part was in July...
Remote Access Track Stabilisation- Helicopter Drop – 1823
PROJECT: Australian Concrete Mats provide a stable, permeable surface for remote access track upgrades in the salty marshes and coastal wetlands of...
Steep Farm Track – Chilcotts Grass NSW – 0698C
PROJECT: Steep Sloped Farm Track needed firm surface to drive on and stop washout of gravel LOCATION: CHILCOTTS GRASS near LISMORE NSW 2480 PROJECT...
Steep Bush Track at Chilcotts Grass NSW – 0698B
PROJECT: Steep sloped bush track and run off drain on farm needed repair after floods. LOCATION: Chilcotts Grass near Lismore Northern NSW 2480...
Remote Steep Causeway Stabilisation – Moorang Q – 1142
PROJECT: Remote and steep bush track had steep sides. Concrete mats were used to protect slopes from erosion. LOCATION: Moorang QLD PROJECT STATS:...
Nursery Tracks and Drainage – Teven NSW – 1172
PROJECT: Nursery located on sloped site with boggy tracks, erosion and washouts of gravel and drainage issues. LOCATION: TEVEN NSW 2478 PROJECT...
Steep Slope Access Track- Tregeagle NSW – 0920
PROJECT: Steep Sloping Access Track and road LOCATION: TREGEAGLE NSW 2480 PROJECT STATS: Mat: Flexible Concrete Erosion MatsUnderlay: Non-Woven...
Remote Steep Mountain Road – Lithgow NSW – 1246
PROJECT: Very steep and remote access road needed a permanent paving solution for access with trucks and heavy machinery for bush fire management as...
Fire Trail Design on Rural Driveway at Mcleans Ridges NSW – 1086
PROJECT: New 3.6m wide and 500m long steep rural driveway. Council would not approve standard gravel paving, so an alternative pavement was...
Parking and Turning Pad at Goonellabah NSW – 0388
PROJECT: Create a hard driveable surface for parking and turning for vehicles to avoid getting bogged on grassy driveway LOCATION: Skyline Road...
Resurface Gravel Driveway at Alstonvale NSW – 0100.L
PROJECT: Resurface a rural gravel driveway with concrete mats after heavy seasonal rains washed out gravel LOCATION: Alstonvale in Northern NSW 2477...
Access Track across Causeway Cleveland QLD – 0260
PROJECT: Access tracks for in and out of the concrete causeway on low creek crossing. LOCATION: Dept. of Agriculture and Fisheries Redland Research...
Sloped Driveway and Run-off Drain – Mcleans Ridges NSW – 0448
PROJECT: A new home on a sloped block created issues with driveway erosion and drainage from sloping site. LOCATION: Mcleans Ridges NSW 2480 PROJECT...
Beach Access at Clarkes Beach Byron Bay NSW – ACM 0230
PROJECT: Beach Access track needed to be stabilised for foot traffic as well as Emergency and recreational vehicle access to the beach. LOCATION:...
Resurface Sloped Gravel Driveway at Uralba NSW – 0100.J
PROJECT: Resurface washed out and sloping gravel driveway LOCATION: Gap Road Uralba NSW 2477 PROJECT STATS: Mat: Flexible Concrete Erosion Mat...
Driveway Swale Drain and Whoa Boy at Houghlahans Creek NSW – 0196
PROJECT: Repair to eroded gravel driveway included installing concrete erosion mats on the roadside swale and also creating a who boy across the...
How to fix a washed-out gravel driveway using concrete erosion mats
HOW TO FIX A WASHED-OUT GRAVEL DRIVEWAY For those on the land with dirt or gravel driveways, heavy rain can be a bit of a bummer as well as...
Grass Driveway in Orange NSW – 0144
PROJECT: Driveway over soft grass and boggy patches LOCATION: Orange NSW PROJECT STATS: 7 Rolls - 2.4m wide x 10m long Biodegradable Nutrition...
Sand Driveway and Beach Access near Gladstone QLD – 0132
PROJECT: Driveway over sand to tents and for safe beach access LOCATION: Near Gladstone QLD 4680 PROJECT STATS: 1 Roll - 2.4m wide x 15m long...
Trail Bike Track Repair at Alstonville NSW – 0100.F
PROJECT: Repair Mountain Bike Trail that had become unsafe due to erosion. LOCATION: Duck Creek Mountain Trail Bike Park. Alstonville NSW 2477...
Temporary Boat Ramp at Dingo Beach QLD – 0103
PROJECT: Build Temporary Boat Ramp for access alongside the construction of permanent ramp LOCATION: DINGO BEACH near PROSERPINE QLD 4800 PROJECT...
When Building Your Rural Driveway and Access Roads Consider Rural Fire Service Standards and Trail Design Publications.
The RFS Fire Trail Standards in combination with the SCS Fire Trail Design, Construction and Maintenance Manual provides for suitably appropriate access for firefighting vehicles commonly used for bush firefighting operations in NSW.
“Many of the existing trails have been built at relatively low cost, follow natural landforms, with construction consisting of minimal earthworks, unsealed surfaces and basic drainage structures. The consideration and application of effective erosion and sediment control measures is critically important from an economic and environmental impact perspective. For any new fire trail construction or maintenance proposal, the application of the principles outlined in this manual, will minimise environmental impact, improve trail durability and decrease maintenance frequency and cost.” EXCERPT From Page 5 Fire Trail Design Construction Maintenance Manual. Version 2 June 2018