Replace Rip Rap on Roadside Drain at Beechmont Q – 0116

Replace Rip Rap on Roadside Drain at Beechmont Q – 0116

PROJECT: Replace eroded and failing Rip Rap drain with Flexible Concrete Erosion Mats LOCATION: Beechmont QLD 4211 PROJECT STATS: 180 square metres. Mat width 1.2m wide 7 hours start to finish 12 tonne excavator 1 operator and 2 labourer OUR REF: ACM 0116 Click to...
Upgrade Stormwater Drains at Lismore – 0111

Upgrade Stormwater Drains at Lismore – 0111

PROJECT: Lismore City COuncil Upgrade eroded stormwater drains by lining with flexible concrete mats LOCATION: Keen Street Gundarimba Lismore NSW 2480 PROJECT STATS: 240 square metres 5 hours start to finish 8 tonne excavator 1 operator and 2 labourers OUR REF: ACM...
Dam Spillway at Conondale QLD – 0143

Dam Spillway at Conondale QLD – 0143

PROJECT: To repair a dam spillway that was eroding after every rain event.   LOCATION: Harpers Creek Road CONONDALE QLD 4552 PROJECT STATS: 57 square metres 2 rolls – 2.4m wide x 12m mat Underlay geotextile was Non-woven underlay 1 x 5 ton excavator with bucket...
Boat Ramp into river at Lower Portland NSW – 0140

Boat Ramp into river at Lower Portland NSW – 0140

PROJECT: Build Boat Ramp for river bank LOCATION: Wheelbarrow Ridge Road LOWER PORTLAND NSW 2756 PROJECT STATS: 72 square metres 2 Rolls – 2.4m wide x 15m Non-Woven Geotextile Underlay Excavator to install 1 operator and 1 labourer  OUR REF: ACM 0140 Download...
Orchard Drain – Rous Mill NSW – 0137

Orchard Drain – Rous Mill NSW – 0137

PROJECT: Cleanup and protection of Macadamia orchard water channel and drain LOCATION: Rous Mill NSW 2477 PROJECT STATS: 180 linear metres 18 rolls – 2.4 wide x 10m long 8 hours start to finish 1 x 8 tonne excavator 1 operator and 2 labourer OUR REF: ACM 0137 Download...